阐述了华能上安电厂300MW亚临界“W”火焰燃烧机组3、4号炉燃烧器改造项目的施工方案及实施过程,分别对施工中吊装机具的布置、设备的拆除、倒运、设备的吊装及安装几个方面进行了总结和说明,证明了施工方案是符合现场实际、切实可行的,同时针对施工中的难点提出相应的解决办法。
闡述瞭華能上安電廠300MW亞臨界“W”火燄燃燒機組3、4號爐燃燒器改造項目的施工方案及實施過程,分彆對施工中弔裝機具的佈置、設備的拆除、倒運、設備的弔裝及安裝幾箇方麵進行瞭總結和說明,證明瞭施工方案是符閤現場實際、切實可行的,同時針對施工中的難點提齣相應的解決辦法。
천술료화능상안전엄300MW아림계“W”화염연소궤조3、4호로연소기개조항목적시공방안급실시과정,분별대시공중조장궤구적포치、설비적탁제、도운、설비적조장급안장궤개방면진행료총결화설명,증명료시공방안시부합현장실제、절실가행적,동시침대시공중적난점제출상응적해결판법。
This paper described the construction plan and implementation process of Huaneng Shang'an electric power plant 300MW Asia critical"W"flame burning unit 3th and 4th furnace burning device transformation project, respectively made summary and description on the layout of lifting machines, demolition of equipments, hauling and equipment lifting in construction, proved that this construction plan meet the site actual situation and practice, and proposed corresponding solutions for difficulties in construction.