价值工程
價值工程
개치공정
VALUE ENGINEERING
2015年
27期
105-106
,共2页
过断层带%水情分析%底板加固%壁后注浆
過斷層帶%水情分析%底闆加固%壁後註漿
과단층대%수정분석%저판가고%벽후주장
fault zone%hydrological analysis%floor reinforcement%grouting behind segment
鹤煤九矿+15皮带巷过F153断层及F979断层破碎带,导致巷道底板出水,进行出水原因分析后,采取了一系列措施,并介绍治理水害具体做法,对巷底进行了预埋槽钢打砼、注浆加固,对两帮壁后注浆堵水有效地控制了底板水害,消除了安全隐患,保证了矿井安全生产。
鶴煤九礦+15皮帶巷過F153斷層及F979斷層破碎帶,導緻巷道底闆齣水,進行齣水原因分析後,採取瞭一繫列措施,併介紹治理水害具體做法,對巷底進行瞭預埋槽鋼打砼、註漿加固,對兩幫壁後註漿堵水有效地控製瞭底闆水害,消除瞭安全隱患,保證瞭礦井安全生產。
학매구광+15피대항과F153단층급F979단층파쇄대,도치항도저판출수,진행출수원인분석후,채취료일계렬조시,병개소치리수해구체주법,대항저진행료예매조강타동、주장가고,대량방벽후주장도수유효지공제료저판수해,소제료안전은환,보증료광정안전생산。
The +15 belt roadway of The 9th Mine of HNEC Hebi Coal Company passes through F153 fault and F979 fault fracture zone, which results in roadway floor water bursting. This paper analyzes the causes of water bursting, takes a series of measures, and introduces the specific practice of the control of water disaster, conducts embedded channel steel concrete and grouting reinforcement at the floor of roadway, and also carries out grouting behind segment on two sides to effectively control floor water hazard, eliminate the potential safety hazard and ensure the safety production of mine.