JOURNAL OF HUAZHONG UNIVERSITY OF SCIENCE AND TECHNOLOGY·URBAN SCIENCE
2015年
3期
16-21
,共6页
隔震经济性%价值工程%工程项目决策
隔震經濟性%價值工程%工程項目決策
격진경제성%개치공정%공정항목결책
economy of seismic isolation%value engineering%decision-making of engineering projects
现有隔震建筑经济性研究缺乏对建筑无形价值的考量,影响决策者对隔震技术应用决策的评估。引入价值工程法对隔震建筑经济性进行分析,建立隔震建筑决策功能评价指标体系,运用模糊综合分析法进行功能评价,基于全寿命周期法展开成本分析,根据多遇、设防、罕遇地震超越概率及对应的破坏性态损失值,推导失效损失费用全概率计算公式,提出隔震项目决策中应用价值工程法的步骤和需要确定的参数,建立隔震建筑决策价值评价模型。通过某幼儿园项目决策实例分析,结果表明,采用隔震技术设计,建筑功能提升,全寿命周期成本略高,总体应用价值提升。分析结果可为建筑应用隔震技术决策分析提供参考。
現有隔震建築經濟性研究缺乏對建築無形價值的攷量,影響決策者對隔震技術應用決策的評估。引入價值工程法對隔震建築經濟性進行分析,建立隔震建築決策功能評價指標體繫,運用模糊綜閤分析法進行功能評價,基于全壽命週期法展開成本分析,根據多遇、設防、罕遇地震超越概率及對應的破壞性態損失值,推導失效損失費用全概率計算公式,提齣隔震項目決策中應用價值工程法的步驟和需要確定的參數,建立隔震建築決策價值評價模型。通過某幼兒園項目決策實例分析,結果錶明,採用隔震技術設計,建築功能提升,全壽命週期成本略高,總體應用價值提升。分析結果可為建築應用隔震技術決策分析提供參攷。
현유격진건축경제성연구결핍대건축무형개치적고량,영향결책자대격진기술응용결책적평고。인입개치공정법대격진건축경제성진행분석,건립격진건축결책공능평개지표체계,운용모호종합분석법진행공능평개,기우전수명주기법전개성본분석,근거다우、설방、한우지진초월개솔급대응적파배성태손실치,추도실효손실비용전개솔계산공식,제출격진항목결책중응용개치공정법적보취화수요학정적삼수,건립격진건축결책개치평개모형。통과모유인완항목결책실례분석,결과표명,채용격진기술설계,건축공능제승,전수명주기성본략고,총체응용개치제승。분석결과가위건축응용격진기술결책분석제공삼고。
The research of economy analysis for isolation buildings were unable to evaluate the intangible value of building, it may mislead the decision-makers to make inappropriate evaluation of isolation technology. For these reasons, the work done in this paper introduces the Value Engineering to analyze the economy of isolation projects, setting up the index system of function assess of isolation building, evaluating the function coefficient using fuzzy comprehensive evaluation method. By using the method of life-cycle cost to evaluate the cost analysis, based on the earthquake frequency of different areas and the resulting failure loss value, the derivative of a total probability formula is derived for failure loss costs, presenting the procedures and the data parameter required of decision-making on isolation projects, setting up the comprehensive value model. Analysis of project decision through a kindergarten, the function of building could improved. The whole life-cycle costs a little more and the application value is improved. Thus, the analysis result provides reference for the application of decision-making on isolation building.