孙秀容 赵竹占 郦逸根 戴纯俊
孫秀容 趙竹佔 酈逸根 戴純俊
손수용 조죽점 역일근 대순준
剪切波 越江隧道 工程应用
剪切波 越江隧道 工程應用
전절파 월강수도 공정응용
shearing wave , cross the Huangpu River tunnel , engineering application.
该文利用单孔波速测试技术,对上海越江隧道工程场地作稳定性地质调查与评价.剪切波测试成果表明,工程场地属软弱场地土,场地类别为Ⅳ类;不需要考虑土层的液化现象;Ⅶ度地震烈度条件下,工程场地不会发生震陷问题;场地地脉动卓越周期为0.60~0.81s.
該文利用單孔波速測試技術,對上海越江隧道工程場地作穩定性地質調查與評價.剪切波測試成果錶明,工程場地屬軟弱場地土,場地類彆為Ⅳ類;不需要攷慮土層的液化現象;Ⅶ度地震烈度條件下,工程場地不會髮生震陷問題;場地地脈動卓越週期為0.60~0.81s.
해문이용단공파속측시기술,대상해월강수도공정장지작은정성지질조사여평개.전절파측시성과표명,공정장지속연약장지토,장지유별위Ⅳ류;불수요고필토층적액화현상;Ⅶ도지진열도조건하,공정장지불회발생진함문제;장지지맥동탁월주기위0.60~0.81s.
According to the theory of dastic wave, wave speed had a certain mathematical relationship with geotechnical physical mechanics parameter when wave spread in layer. The wave speed testing technology in single - hole was valuate about just based on this theory. With this technology , the article made geological survey and esite steadily quality of cross the Huangpu River tunnel in Shanghai. Achievements in shearing wave test indicated that the engineering site belonged to soft site soil and itg dassification was grade IV, the site soil didnt need to be considered about liquefied phenomena; Subsidence problem would not arise by the condition of grade VII earthquake intensity ; the intrinsic period of ground pulsation in 30m depth was 0.63 - 0.81 s.