在借鉴已有研究的基础上,归纳了核电站公众接受性影响因素,运用解释结构模型法(ISM)从中识别核电站公众接受性的主要影响因素,据此构建涵盖主要影响因素的核电站公众接受性评价指标体系。以广东大亚湾核电站为例,运用模糊层次综合评价法对其公众接受性进行综合评价,得出大亚湾核电站的整体公众接受性处于一般水平,在认知因素、情感因素、意图因素、信任因素、参与可控制性等方面存在着不足。据此,大亚湾核电站需要在核电站知识普及、建立联动新闻发布机制、强化监督管理、加强与民众沟通、提高民众参与性等方面制定提升公众接受性措施。
在藉鑒已有研究的基礎上,歸納瞭覈電站公衆接受性影響因素,運用解釋結構模型法(ISM)從中識彆覈電站公衆接受性的主要影響因素,據此構建涵蓋主要影響因素的覈電站公衆接受性評價指標體繫。以廣東大亞灣覈電站為例,運用模糊層次綜閤評價法對其公衆接受性進行綜閤評價,得齣大亞灣覈電站的整體公衆接受性處于一般水平,在認知因素、情感因素、意圖因素、信任因素、參與可控製性等方麵存在著不足。據此,大亞灣覈電站需要在覈電站知識普及、建立聯動新聞髮佈機製、彊化鑑督管理、加彊與民衆溝通、提高民衆參與性等方麵製定提升公衆接受性措施。
재차감이유연구적기출상,귀납료핵전참공음접수성영향인소,운용해석결구모형법(ISM)종중식별핵전참공음접수성적주요영향인소,거차구건함개주요영향인소적핵전참공음접수성평개지표체계。이엄동대아만핵전참위례,운용모호층차종합평개법대기공음접수성진행종합평개,득출대아만핵전참적정체공음접수성처우일반수평,재인지인소、정감인소、의도인소、신임인소、삼여가공제성등방면존재착불족。거차,대아만핵전참수요재핵전참지식보급、건립련동신문발포궤제、강화감독관리、가강여민음구통、제고민음삼여성등방면제정제승공음접수성조시。
On the basis of existing researches, the influence factors of public acceptance to nuclear power plant are summarized. By applying the method of interpretative structural modeling (ISM) , the main influ- ence factors of public acceptance to nuclear power plant are identified such that an evaluation index system is constructed. With Daya Bay nuclear power plant in Guangdong as an example, its public acceptance is evaluated by applying the fuzzy analytic hierarchy process (AHP) comprehensive evaluation method. It is concluded that the public acceptance to Daya Bay nuclear power plant is at the average level. There are some deficiencies in cognition, emotion, intention, trust, and participation in the controllability. As a so- lution, the Daya Bay nuclear power plant should take measures to improve the level of public acceptance. These measures include popularizing nuclear power plant knowledge, establishing the linkage news release mechanism, strengthening supervision and management, intensifying communication with the public, im- proving public participation, and so on.