内蒙古财经大学学报
內矇古財經大學學報
내몽고재경대학학보
Journal of inner Mongolia finance and economics college
2015年
1期
39~42
,共null页
URC522 D/C 风险 SWOT
URC522 D/C 風險 SWOT
URC522 D/C 풍험 SWOT
URC522 ; D/C ; risk ; SWOT
论文通过对国际跟单托收流程的分析,发现托收的风险与托收的提示有关。运用列举与列举的方法,解释了托收提示细节中潜在的可能性风险。并通过SWOT模型分析,说明了在跟单提示下进出口双方使用托收的优劣势所在以及策略的选择。
論文通過對國際跟單託收流程的分析,髮現託收的風險與託收的提示有關。運用列舉與列舉的方法,解釋瞭託收提示細節中潛在的可能性風險。併通過SWOT模型分析,說明瞭在跟單提示下進齣口雙方使用託收的優劣勢所在以及策略的選擇。
논문통과대국제근단탁수류정적분석,발현탁수적풍험여탁수적제시유관。운용열거여열거적방법,해석료탁수제시세절중잠재적가능성풍험。병통과SWOT모형분석,설명료재근단제시하진출구쌍방사용탁수적우열세소재이급책략적선택。
Through an analysis of international orders and documentary collection process, this paper finds out that documentary risk is related to alert, explains the possible risks existed in the details of collection alert with the methods of listing and example. Further, through SWOT analysis, this paper puts forward the advantages and disadvantages existed in the use of collection of the import and export sides under documentary alert as well as the strate- gy options.