在研究三维激光扫描原理的基础上,对溶洞的激光探测方法进行了研究。针对复杂溶洞激光扫描点云数据,研究了点云数据最小距离准则与最大张角准则的精简算法、三维点云数据坐标变换与数据拼接原理。以张家界向家包2号铁路隧道溶洞为例,采用C?ALS探测系统对溶洞进行了三维激光探测,对获取的溶洞点云数据经过精简、转换坐标和拼接处理后,运用三维矿业软件Dimine建立了溶洞三维模型,在此基础上完成体积计算、关键位置平剖面输出,并重点研究了平行隧道、垂直隧道及沿溶洞延伸三个主要方向上溶洞与隧道工程的三维空间位置关系,得出了不同剖面上溶洞与隧道的直线距离。研究结果对指导隧道路线规划、安全施工具有重要工程意义。
在研究三維激光掃描原理的基礎上,對溶洞的激光探測方法進行瞭研究。針對複雜溶洞激光掃描點雲數據,研究瞭點雲數據最小距離準則與最大張角準則的精簡算法、三維點雲數據坐標變換與數據拼接原理。以張傢界嚮傢包2號鐵路隧道溶洞為例,採用C?ALS探測繫統對溶洞進行瞭三維激光探測,對穫取的溶洞點雲數據經過精簡、轉換坐標和拼接處理後,運用三維礦業軟件Dimine建立瞭溶洞三維模型,在此基礎上完成體積計算、關鍵位置平剖麵輸齣,併重點研究瞭平行隧道、垂直隧道及沿溶洞延伸三箇主要方嚮上溶洞與隧道工程的三維空間位置關繫,得齣瞭不同剖麵上溶洞與隧道的直線距離。研究結果對指導隧道路線規劃、安全施工具有重要工程意義。
재연구삼유격광소묘원리적기출상,대용동적격광탐측방법진행료연구。침대복잡용동격광소묘점운수거,연구료점운수거최소거리준칙여최대장각준칙적정간산법、삼유점운수거좌표변환여수거병접원리。이장가계향가포2호철로수도용동위례,채용C?ALS탐측계통대용동진행료삼유격광탐측,대획취적용동점운수거경과정간、전환좌표화병접처리후,운용삼유광업연건Dimine건립료용동삼유모형,재차기출상완성체적계산、관건위치평부면수출,병중점연구료평행수도、수직수도급연용동연신삼개주요방향상용동여수도공정적삼유공간위치관계,득출료불동부면상용동여수도적직선거리。연구결과대지도수도로선규화、안전시공구유중요공정의의。
Based on the investigation of working principle of 3D laser scanner, laser detection methods for karst cave were discussed. Aiming at the point cloud data of complex karst cave obtained from laser scanning, the simplified algorithm for the minimum distance and the maximum angle, 3D coordinate transformation for the point data and data splicing theory were all studied. After that,№2 railway tunnel in Zhangjiajie Xiangjiabao that is running through a karst cave was taken as an example for analysis. The C?ALS detection system was adopted to scan karst cave with 3D laser. After the data reduction, coordinate transformation and data splicing for the obtained point cloud data, a 3D model was created with the mining software of Dimine. Using the 3D model, the volume calculation and output of the sectional plane of critical positions have been conducted. Based on the investigation on the spatial relationships between cave and tunnel in three?dimensional directions perpendicular and parallel to the tunnels, as well as along extension of the cave, the linear distances between the tunnel and cave on the different sectional plane were finally obtained. This study result is of important significance in guiding the future tunnel route planning and safe construction.