中价协文件%电网工程预规%工程造价服务%收费标准
中價協文件%電網工程預規%工程造價服務%收費標準
중개협문건%전망공정예규%공정조개복무%수비표준
document of CACPCM%PGCBCR%project cost service%charging standard
针对现阶段电网工程中涉及的各项工程造价服务,从已完成批复或评审的概算数据出发,分析对比了中价协[2013]35号文件与《电网工程预规》中相关费用标准的联系及水平差异,为工程造价咨询企业的发展提供了参考。
針對現階段電網工程中涉及的各項工程造價服務,從已完成批複或評審的概算數據齣髮,分析對比瞭中價協[2013]35號文件與《電網工程預規》中相關費用標準的聯繫及水平差異,為工程造價咨詢企業的髮展提供瞭參攷。
침대현계단전망공정중섭급적각항공정조개복무,종이완성비복혹평심적개산수거출발,분석대비료중개협[2013]35호문건여《전망공정예규》중상관비용표준적련계급수평차이,위공정조개자순기업적발전제공료삼고。
ABSTRACT:In the light of various project cost services involved in the power grid project at the present stage, starting from the budget estimate data the data that the approval or review has been completed, this paper carries out a comparative analysis on the connection and level difference of the relevant costs standards stipulated in the document No. 35 of CACPCM and PGCBCR, which provides the reference for the development of engineering cost consulting enterprises.