水电与新能源
水電與新能源
수전여신능원
Hydropower And Nwe Energy
2015年
8期
42-43,47
,共3页
冲砂底孔%自动抓梁%改造%龚嘴水电站
遲砂底孔%自動抓樑%改造%龔嘴水電站
충사저공%자동조량%개조%공취수전참
sediment flushing bottom outlets%automatic grabbing beam%renovation%Gongzui Hydropower Station
对龚嘴电站大坝门机自动抓梁运行中在水下不能穿、退销等运行中常见问题,提出了改进意见,并对已有自动抓梁泵站进行改造,提高了设备的可靠性,保障人员设备的安全,并根据实际经验,提出了操作注意事项。
對龔嘴電站大壩門機自動抓樑運行中在水下不能穿、退銷等運行中常見問題,提齣瞭改進意見,併對已有自動抓樑泵站進行改造,提高瞭設備的可靠性,保障人員設備的安全,併根據實際經驗,提齣瞭操作註意事項。
대공취전참대패문궤자동조량운행중재수하불능천、퇴소등운행중상견문제,제출료개진의견,병대이유자동조량빙참진행개조,제고료설비적가고성,보장인원설비적안전,병근거실제경험,제출료조작주의사항。
In the operation of the automatic grabbing beam of gantry crane in Gongzui Hydropower Station , difficulties in the connection and disconnection of dowels are frequently encountered .Thus, several renovation advices on the automat-ic grabbing beam are proposed .After the renovation , the reliability of the device is improved and the safety of the work-ers is ensured .In addition, issues that should be noted in the operation are presented .