立井%巨厚砾岩层%快速施工作业线
立井%巨厚礫巖層%快速施工作業線
립정%거후력암층%쾌속시공작업선
high position drilling%gas drainage%rational horizon of final hole
本文通过对立井巨厚砾岩层段施工作业线的研究,确定了由大绞车、大吊桶、大抓岩机、大模板、伞钻深孔爆破等组成的"四大一深"立井快速掘砌机械化作业线,取得了良好的经济效益和社会效益.
本文通過對立井巨厚礫巖層段施工作業線的研究,確定瞭由大絞車、大弔桶、大抓巖機、大模闆、傘鑽深孔爆破等組成的"四大一深"立井快速掘砌機械化作業線,取得瞭良好的經濟效益和社會效益.
본문통과대립정거후력암층단시공작업선적연구,학정료유대교차、대조통、대조암궤、대모판、산찬심공폭파등조성적"사대일심"립정쾌속굴체궤계화작업선,취득료량호적경제효익화사회효익.
High level borehole gas drainage is an important means on the corner and surface gas transfinite governance, the Xinan Coal Mine as the research background, analyzes the effect of high level borehole gas drainage effect of key factors, through theoretical analysis and calculation, field drainage experiment of high gas drainage drilling end hole of the reasonable horizon. Study concluded that: high level borehole end hole reasonable horizon should fall from the roof 15m-28.1m, from airway wall of roadway distance should be controlled in the range of 30.6m-44.5m.