水电站%三漏%密封%防与治
水電站%三漏%密封%防與治
수전참%삼루%밀봉%방여치
hydropower station%three leakage problems%seal%prevention and treatment
针对水电站的“三漏”(漏油、漏气、漏水)问题,结合瀑布沟水电站常见渗漏缺陷现象,从密封材料、密封结构、安装工艺及技术管理等方面论述了“查、定、重、改、换、堵、控、严、接、建、细”的治理方式,实施效果良好。
針對水電站的“三漏”(漏油、漏氣、漏水)問題,結閤瀑佈溝水電站常見滲漏缺陷現象,從密封材料、密封結構、安裝工藝及技術管理等方麵論述瞭“查、定、重、改、換、堵、控、嚴、接、建、細”的治理方式,實施效果良好。
침대수전참적“삼루”(루유、루기、루수)문제,결합폭포구수전참상견삼루결함현상,종밀봉재료、밀봉결구、안장공예급기술관리등방면논술료“사、정、중、개、환、도、공、엄、접、건、세”적치리방식,실시효과량호。
From the aspects of seal materials , seal structures , installation technology and technology management , pre-vention and treatment measures for the “three leakage problems” ( i.e., oil leakage, gas leakage and water leakage ) that are commonly found in Pubugou Hydropower Station are introduced .These measures can be defined as: examina-tion, determination, reworking, renovation, replacing, blocking, controlling, strictness, connection, construction and carefulness.Satisfactory results are obtained with these measures in practice .