建筑经济
建築經濟
건축경제
Construction Economy
2015年
9期
76-78
,共3页
EPC%项目实施%费用控制%设计优化%采购管理
EPC%項目實施%費用控製%設計優化%採購管理
EPC%항목실시%비용공제%설계우화%채구관리
Engineering%Procurement and Construction%project execution%cost control%design optimization%procurement management
从EPC总承包的视角,针对项目实施阶段的特点,提出费用控制措施.其中详细设计环节主要措施:编制费用计划和控制指标,优化设计方案;采购及施工环节主要措施:把握采购管理,合理控制施工费用,做好进度结算与付款等.
從EPC總承包的視角,針對項目實施階段的特點,提齣費用控製措施.其中詳細設計環節主要措施:編製費用計劃和控製指標,優化設計方案;採購及施工環節主要措施:把握採購管理,閤理控製施工費用,做好進度結算與付款等.
종EPC총승포적시각,침대항목실시계단적특점,제출비용공제조시.기중상세설계배절주요조시:편제비용계화화공제지표,우화설계방안;채구급시공배절주요조시:파악채구관리,합리공제시공비용,주호진도결산여부관등.
From the perspective of EPC general contractor,considering the characteristics of EPC project execution stage,proposes the key measures for cost control,detailed design link includes:formulating cost plan and control index,optimizing design scheme,project procurement and construction link includes:grasping the procurement management,reasonably controlling construction cost and completing schedule settlement and payment,etc.