科技视界
科技視界
과기시계
Science & Technology Vision
2015年
28期
85-85,197
,共2页
试验接口装置%接口互联%构型切换%继电器%铁鸟
試驗接口裝置%接口互聯%構型切換%繼電器%鐵鳥
시험접구장치%접구호련%구형절환%계전기%철조
Test interface unit%Interfacing%Configuration switch%Relay%Iron bird
介绍了一种试验接口装置,它能够在不破坏系统连接电缆的情况下,实现试验设备和被测系统之间的连接,并将系统信号抽引出来,满足测试要求。同时,它也能够实现试验设备仿真信号与被测系统真件信号的切换,满足系统验证和排故要求。
介紹瞭一種試驗接口裝置,它能夠在不破壞繫統連接電纜的情況下,實現試驗設備和被測繫統之間的連接,併將繫統信號抽引齣來,滿足測試要求。同時,它也能夠實現試驗設備倣真信號與被測繫統真件信號的切換,滿足繫統驗證和排故要求。
개소료일충시험접구장치,타능구재불파배계통련접전람적정황하,실현시험설비화피측계통지간적련접,병장계통신호추인출래,만족측시요구。동시,타야능구실현시험설비방진신호여피측계통진건신호적절환,만족계통험증화배고요구。
In this paper, a test interface unit is introduced. Through it, test equipment can quickly connect to the system under test and the signals of the system can be simply measured, without destroying the system connecting cable. At the same time, it can also realiZe the switching between the simulation and the real system, meeting the requirements of the system verification and trouble shooting.