CFG 桩%复合地基%桩端持力层%休止期
CFG 樁%複閤地基%樁耑持力層%休止期
CFG 장%복합지기%장단지력층%휴지기
CFG pile%composite foundation%bearing course at pile end%resting period
以西安市北郊某建设项目为例,结合场地的工程地质条件,对复合地基的设计情况进行了介绍,分析了桩端持力层对 CFG桩复合地基休止期的影响,得出了一些有意义的结论,为类似桩基设计提供参考。
以西安市北郊某建設項目為例,結閤場地的工程地質條件,對複閤地基的設計情況進行瞭介紹,分析瞭樁耑持力層對 CFG樁複閤地基休止期的影響,得齣瞭一些有意義的結論,為類似樁基設計提供參攷。
이서안시북교모건설항목위례,결합장지적공정지질조건,대복합지기적설계정황진행료개소,분석료장단지력층대 CFG장복합지기휴지기적영향,득출료일사유의의적결론,위유사장기설계제공삼고。
Taking some construction program in Xi’an as the example,the paper introduces the design for the composite foundation by combining with the engineering geological condition,analyzes the influence of the bearing course at pile end on resting phase of CFG pile’s composite foun-dation,and achieves some conclusion,so as to provide some reference for design of some similar pile foundations.