河南科技
河南科技
하남과기
Journal of Henan Science and Technology
2015年
11期
35-37
,共3页
井筒%冻结法%坚硬表土层%松动爆破
井筒%凍結法%堅硬錶土層%鬆動爆破
정통%동결법%견경표토층%송동폭파
wellbore%freezing method%hard topsoil layer%loose blasting
冻结法是井筒施工中有效穿过表土层和软岩层的特殊施工方法,一般情况下可采用挖掘机或人工风镐挖掘.周油坊矿在副井施工中遇到了含砾石的坚硬表土层,一般方法很难通过,为此制定了放松动炮的方法通过坚硬表土层,结果表明此方法行之有效,且未引起突水情况
凍結法是井筒施工中有效穿過錶土層和軟巖層的特殊施工方法,一般情況下可採用挖掘機或人工風鎬挖掘.週油坊礦在副井施工中遇到瞭含礫石的堅硬錶土層,一般方法很難通過,為此製定瞭放鬆動砲的方法通過堅硬錶土層,結果錶明此方法行之有效,且未引起突水情況
동결법시정통시공중유효천과표토층화연암층적특수시공방법,일반정황하가채용알굴궤혹인공풍호알굴.주유방광재부정시공중우도료함력석적견경표토층,일반방법흔난통과,위차제정료방송동포적방법통과견경표토층,결과표명차방법행지유효,차미인기돌수정황
Freezing method isspecial construction method in shaft construction effectively getting through the topsoil and soft rock.Under normal circumstances, excavator or pneumatic pick mining can be used for excavation. Zhouyou?fangmine in auxiliary shaft construction methard topsoil layerwith gravel, it isdifficult to passby general methods, therefore,the relaxation dynamic method of guns was made to get through the hard topsoil layer. The results show that this method is feasibleand effective, withoutcausingwater gushing.