水运工程
水運工程
수운공정
Port & Waterway Engineering
2015年
8期
63-65
,共3页
涂伟成%丁碧珍%蒋华东%刘松
塗偉成%丁碧珍%蔣華東%劉鬆
도위성%정벽진%장화동%류송
风冷系统%船闸%温度应力%浇筑温度
風冷繫統%船閘%溫度應力%澆築溫度
풍랭계통%선갑%온도응력%요축온도
air-cooling system%lock%temperature stress%pouring temperature
在富春江船闸扩建改造工程风冷系统实际施工过程中,对粗骨料、拌合水、混凝土出机口温度以及浇筑温度进行实时监测,研究风冷骨料及制冷水系统的冷却能力,以指导后期施工。
在富春江船閘擴建改造工程風冷繫統實際施工過程中,對粗骨料、拌閤水、混凝土齣機口溫度以及澆築溫度進行實時鑑測,研究風冷骨料及製冷水繫統的冷卻能力,以指導後期施工。
재부춘강선갑확건개조공정풍랭계통실제시공과정중,대조골료、반합수、혼응토출궤구온도이급요축온도진행실시감측,연구풍랭골료급제랭수계통적냉각능력,이지도후기시공。
According to the actual construction process of air cooling system of the Fuchun river lock expansion and improving project,through the real-time monitoring of coarse aggregate,mixing water,the concrete mixer outlet temperature and pouring temperature,this article gives a comprehensive study on the cooling capacity of the air-cooling aggregate and its cooling water system,to provide guidance for the later construction.