柬埔寨桑河%二级水电站%二期围堰%防渗%高喷灌浆
柬埔寨桑河%二級水電站%二期圍堰%防滲%高噴灌漿
간포채상하%이급수전참%이기위언%방삼%고분관장
Se San second cascade hydropower station%second stage cofferdam%seepage%high pressure jet grouting
桑河二级水电站装机容量为400MW,目前为柬埔寨在建的最大水电站。高喷防渗墙的各项指标达到设计要求,基坑抽排水完成后,上下游围堰基本处于滴水不漏,确保了基坑开挖和砼浇筑顺利进展,为桑河二级水电站后续工作的顺利开展提供了可靠保障。
桑河二級水電站裝機容量為400MW,目前為柬埔寨在建的最大水電站。高噴防滲牆的各項指標達到設計要求,基坑抽排水完成後,上下遊圍堰基本處于滴水不漏,確保瞭基坑開挖和砼澆築順利進展,為桑河二級水電站後續工作的順利開展提供瞭可靠保障。
상하이급수전참장궤용량위400MW,목전위간포채재건적최대수전참。고분방삼장적각항지표체도설계요구,기갱추배수완성후,상하유위언기본처우적수불루,학보료기갱개알화동요축순리진전,위상하이급수전참후속공작적순리개전제공료가고보장。
Se San second cascade hydropower station with the installed capacity of 400MW is the largest one under construction in Cambodia now. All indicators of the high pressure jet grouting cutoff wall meet the design requirements. After completion of excavation and drainage pumping, the cofferdam is basically in watertight, which ensures the progress of base pit excavation and concrete pouring and guarantee the development of the follow-up work.