马钢30000 m3/h制氧机原配备粗氪氙系统,投产10年该粗氪氙系统一直未投运.为提高经济效益,对粗氪氙系统经过简单改造投入运行.对改造内容、操作调试进行了介绍,并总结了操作调整中需注意的问题.
馬鋼30000 m3/h製氧機原配備粗氪氙繫統,投產10年該粗氪氙繫統一直未投運.為提高經濟效益,對粗氪氙繫統經過簡單改造投入運行.對改造內容、操作調試進行瞭介紹,併總結瞭操作調整中需註意的問題.
마강30000 m3/h제양궤원배비조극선계통,투산10년해조극선계통일직미투운.위제고경제효익,대조극선계통경과간단개조투입운행.대개조내용、조작조시진행료개소,병총결료조작조정중수주의적문제.
The existing crude Kr-Xe extraction system in the 30000 m3/h oxygen gener-ator of MaSteel had not been put into use for 10 years since the operation startup of the generating unit. In order to improve the economic performance, the Kr-Xe extraction system was put into operation after simple transformation. The content and operation commissioning of the transformation project are introduced and problems needing attention in operation adjust-ment are also summarized.