西安理工大学学报
西安理工大學學報
서안리공대학학보
Journal of Xi'an University of Technology
2015年
3期
295-300,305
,共7页
葛苗苗%李宁%郑建国%朱才辉%马旭东
葛苗苗%李寧%鄭建國%硃纔輝%馬旭東
갈묘묘%리저%정건국%주재휘%마욱동
压实黄土%固结蠕变试验%蠕变曲线%Burger模型%数值分析%工后沉降
壓實黃土%固結蠕變試驗%蠕變麯線%Burger模型%數值分析%工後沉降
압실황토%고결연변시험%연변곡선%Burger모형%수치분석%공후침강
compacted loess%consolidation creep test%creep curve%Burger model%numerical analysis%post-construction settlement
为了研究黄土高填方工后沉降规律,开展一系列压实黄土一维固结蠕变试验,分析含水率及压实度对黄土蠕变特性的影响,验证了Burger蠕变模型在描述压实黄土应变与时间关系上的适用性,在该模型基础上,运用FLAC3 D计算了黄土高填方工后沉降规律。结果表明:轴向加载瞬时,试样变形速率较大,随着时间的推移,变形速率减小并趋于稳定,压实黄土蠕变随含水率的提高而增加,随压实度的提高而减小。工后沉降对填料压实标准更敏感,在一定压实度和含水率范围内,工后沉降与含水率和压实度呈线性关系。可以通过高填方工后沉降速率和时间关系曲线上的拐点位置判断工后沉降稳定时间,填料压实度越低、含水率越大,拐点越靠后,沉降稳定的时间越长。
為瞭研究黃土高填方工後沉降規律,開展一繫列壓實黃土一維固結蠕變試驗,分析含水率及壓實度對黃土蠕變特性的影響,驗證瞭Burger蠕變模型在描述壓實黃土應變與時間關繫上的適用性,在該模型基礎上,運用FLAC3 D計算瞭黃土高填方工後沉降規律。結果錶明:軸嚮加載瞬時,試樣變形速率較大,隨著時間的推移,變形速率減小併趨于穩定,壓實黃土蠕變隨含水率的提高而增加,隨壓實度的提高而減小。工後沉降對填料壓實標準更敏感,在一定壓實度和含水率範圍內,工後沉降與含水率和壓實度呈線性關繫。可以通過高填方工後沉降速率和時間關繫麯線上的枴點位置判斷工後沉降穩定時間,填料壓實度越低、含水率越大,枴點越靠後,沉降穩定的時間越長。
위료연구황토고전방공후침강규률,개전일계렬압실황토일유고결연변시험,분석함수솔급압실도대황토연변특성적영향,험증료Burger연변모형재묘술압실황토응변여시간관계상적괄용성,재해모형기출상,운용FLAC3 D계산료황토고전방공후침강규률。결과표명:축향가재순시,시양변형속솔교대,수착시간적추이,변형속솔감소병추우은정,압실황토연변수함수솔적제고이증가,수압실도적제고이감소。공후침강대전료압실표준경민감,재일정압실도화함수솔범위내,공후침강여함수솔화압실도정선성관계。가이통과고전방공후침강속솔화시간관계곡선상적괴점위치판단공후침강은정시간,전료압실도월저、함수솔월대,괴점월고후,침강은정적시간월장。
In order to study the post-construction settlement regularity of loess-high filled em-bankment,the author has conducted a series of uniaxial compression creep tests with compacted loess,analyzed the effect of the moisture content and compaction on creep properties of compac-ted loess.The applicability of Burger model on the relationship between strain and time of the compacted loess is verified.With this model as the constructive FLAC3D is used to calculate the settlement of post-construction of the loess high embankment.The results show that the deform-ation rate of the sample is larger at axial instant loading and as the time goes on,the deformation rate decreases and tends to be stable;with the moisture content the creep deformation of loess is increasing,the degree of compaction get lower with the improvement of compact degree.The post-construction settlement is more sensitive to the compaction standard of the loess.The post-construction settlement is a linear relation with moisture content and compaction degree within a certain range.The inflection point position on the vs-t curve of high earth filling work post settle-ment can be used to estimate the stability time of the post-construction settlement.The lower of the compaction degree of filling materials,the higher moisture content of the filling materials will be,the more rear of the inflection point is,the longer of the post-construction settlement to sta-ble will be.