山西建筑
山西建築
산서건축
Shanxi Architecture
2015年
32期
65-66
,共2页
建筑现场%降排水%基坑%施工
建築現場%降排水%基坑%施工
건축현장%강배수%기갱%시공
building construction site%draining%foundation pit%construction
对建筑施工现场明排水法与井点降水排水法两种主要的降排水措施进行了阐述,并分析了深基坑开挖前降排水施工的准备工作及施工技术要点,指出有效做好建筑施工的降排水工作,不仅能够节省工程用料,还能够为居民安全供水提供保障。
對建築施工現場明排水法與井點降水排水法兩種主要的降排水措施進行瞭闡述,併分析瞭深基坑開挖前降排水施工的準備工作及施工技術要點,指齣有效做好建築施工的降排水工作,不僅能夠節省工程用料,還能夠為居民安全供水提供保障。
대건축시공현장명배수법여정점강수배수법량충주요적강배수조시진행료천술,병분석료심기갱개알전강배수시공적준비공작급시공기술요점,지출유효주호건축시공적강배수공작,불부능구절성공정용료,환능구위거민안전공수제공보장。
This paper elaborated the open draining method and well point draining method two main drainage measures of building construction site,and analyzed the preparation and construction technology main key points of deep foundation pit excavation before draining construction, pointed out that the drainage work of building construction not only could effectively save the engineering materials,also guarantees the safe water supply for residents.