海上油田%动力定位FPSO%临时生产
海上油田%動力定位FPSO%臨時生產
해상유전%동력정위FPSO%림시생산
offshore oilfield%DP FPSO%temporary production
为了保证FPSO坞修期间油田产量,需要考虑临时生产方案,对采用动力定位FPSO进行临时生产的技术方案进行多方面的对比,论证临时生产方案的技术可行性.
為瞭保證FPSO塢脩期間油田產量,需要攷慮臨時生產方案,對採用動力定位FPSO進行臨時生產的技術方案進行多方麵的對比,論證臨時生產方案的技術可行性.
위료보증FPSO오수기간유전산량,수요고필림시생산방안,대채용동력정위FPSO진행림시생산적기술방안진행다방면적대비,론증림시생산방안적기술가행성.
FPSO is the key unit of the offshore field.In order to maintian the production during the FPSO dry dock period, a temporary production recover solution is needed.A solution using DP FPSO is designed to recover the production without the o-riginal FPSO.The solution is proved to be feasible in technical consideration by comprehensive research in several importance factors.