山西建筑
山西建築
산서건축
Shanxi Architecture
2015年
31期
204-204,205
,共2页
保滩工程%结构优化%防渗
保灘工程%結構優化%防滲
보탄공정%결구우화%방삼
beach protection project%structural optimization%anti-leakage
结合金山区城市沙滩以西保滩工程的概况,对该工程在施工期所采取的几项结构优化措施进行了介绍,简要分析了加宽内平台、变单棱体为双棱体结构、设置高压喷射灌浆防渗墙等措施的优点,为提高保滩圈围类工程综合效益提供借鉴。
結閤金山區城市沙灘以西保灘工程的概況,對該工程在施工期所採取的幾項結構優化措施進行瞭介紹,簡要分析瞭加寬內平檯、變單稜體為雙稜體結構、設置高壓噴射灌漿防滲牆等措施的優點,為提高保灘圈圍類工程綜閤效益提供藉鑒。
결합금산구성시사탄이서보탄공정적개황,대해공정재시공기소채취적궤항결구우화조시진행료개소,간요분석료가관내평태、변단릉체위쌍릉체결구、설치고압분사관장방삼장등조시적우점,위제고보탄권위류공정종합효익제공차감。
Combining with the survey of the beach protection projects in the west of the urban beach in Jinshan District,the paper introduces some structural optimal measures during the construction period,briefly analyzes the advantages of measures including the widening inner plat-form,replacement of single-edge structure with the double-edge one,and the anti-leakage walls of high-pressure jet grouting,so as to provide some reference for the comprehensive benefits of beach protection projects.