base station construction%bottleneck%communication operators
文章讲述了基站建设难一直是三家通信运营商的难题,先是被业主漫天要价,历经艰难确定位置后又被“谈辐色变”的居民要求拆除;基站没建成导致网络覆盖不佳,造成用户持续投诉。通信运营商陷入了“死循环”。铁塔公司成立后,承接了通信运营商基站建设任务,这道难题自然也无法回避。
文章講述瞭基站建設難一直是三傢通信運營商的難題,先是被業主漫天要價,歷經艱難確定位置後又被“談輻色變”的居民要求拆除;基站沒建成導緻網絡覆蓋不佳,造成用戶持續投訴。通信運營商陷入瞭“死循環”。鐵塔公司成立後,承接瞭通信運營商基站建設任務,這道難題自然也無法迴避。
문장강술료기참건설난일직시삼가통신운영상적난제,선시피업주만천요개,력경간난학정위치후우피“담복색변”적거민요구탁제;기참몰건성도치망락복개불가,조성용호지속투소。통신운영상함입료“사순배”。철탑공사성립후,승접료통신운영상기참건설임무,저도난제자연야무법회피。
The base station construction has been a difficult three communications carriers of the problem, first by the owners wild speculations, after a dififcult position after being asked to determine the removal of "talking about convergence pale" of the residents; the base station did not lead to the completion of the network coverage is poor, causing the user continue complaints. Telecommunications carrier into a "cycle of death." After the tower company, to undertake the task of building the base station communications operators, however this dififcult nature can not be avoided.