盾构隧道%桥基%数值模拟%变形
盾構隧道%橋基%數值模擬%變形
순구수도%교기%수치모의%변형
shield tunneling%bridge foundation%numerical simulation%deformation
以兰州地铁盾构隧道穿越高架桥基础的实际工程为分析对象,通过数值方法模拟盾构开挖、衬砌施工过程,建立了地层结构及土性条件、高架桥及其基础的三维数值计算模型,开展了盾构隧道单向开挖及双向开挖完成的数值分析,得到了隧道上覆围岩地层沉降变形、衬砌结构应力、桥梁结构应力、桥基应力和变形变化规律。表明隧道上覆土层形成了沉降槽,其沉降曲线呈正态分布;开挖后桩身倾斜变形,桩身下部向洞内方向收敛变形,桩顶保持不变位;桩身的水平应力及轴力影响自上而下逐渐增大。为保证施工安全,对盾构开挖进行超前喷浆加固,对比结果表明注浆加固方法对减小不均匀沉降及盾构施工扰动具有明显效果。
以蘭州地鐵盾構隧道穿越高架橋基礎的實際工程為分析對象,通過數值方法模擬盾構開挖、襯砌施工過程,建立瞭地層結構及土性條件、高架橋及其基礎的三維數值計算模型,開展瞭盾構隧道單嚮開挖及雙嚮開挖完成的數值分析,得到瞭隧道上覆圍巖地層沉降變形、襯砌結構應力、橋樑結構應力、橋基應力和變形變化規律。錶明隧道上覆土層形成瞭沉降槽,其沉降麯線呈正態分佈;開挖後樁身傾斜變形,樁身下部嚮洞內方嚮收斂變形,樁頂保持不變位;樁身的水平應力及軸力影響自上而下逐漸增大。為保證施工安全,對盾構開挖進行超前噴漿加固,對比結果錶明註漿加固方法對減小不均勻沉降及盾構施工擾動具有明顯效果。
이란주지철순구수도천월고가교기출적실제공정위분석대상,통과수치방법모의순구개알、츤체시공과정,건립료지층결구급토성조건、고가교급기기출적삼유수치계산모형,개전료순구수도단향개알급쌍향개알완성적수치분석,득도료수도상복위암지층침강변형、츤체결구응력、교량결구응력、교기응력화변형변화규률。표명수도상복토층형성료침강조,기침강곡선정정태분포;개알후장신경사변형,장신하부향동내방향수렴변형,장정보지불변위;장신적수평응력급축력영향자상이하축점증대。위보증시공안전,대순구개알진행초전분장가고,대비결과표명주장가고방법대감소불균균침강급순구시공우동구유명현효과。
The actual project of the viaduct foundation near Lanzhou metro shield tunnel was analyzed .By simulating the progress of shield excavation and lining construction with numerical methods , a three-dimensional numerical model of stratum configuration ,soil condition ,viaduct and its foundation was established .According to the numerical analysis of one-way and two-way tunnel excavation ,the changing rule of stratum deformation of overlying surrounding rock ,stress on the lining structure ,stress on the viaduct structure and its foundation as well as its deformation was obtained .The result showed that a subsider was formed in the overlying soil stratum ,and its settlement curve presented a normal distribution . After the completion of the excavation ,the lower part of the pile began to incline and deform towards the tunnel ,while the upper part remained unchanged .The influence of horizontal stress and axial force increased from the top downwards . The measure of spray grouting reinforcement before the shield excavation was taken to ensure the construction safety . From the comparison results ,it is drawn that this means of reinforcement has an observable effect on reducing the differ-ential settlement and shield construction disturbance .