水利与建筑工程学报
水利與建築工程學報
수리여건축공정학보
Journal of Water Resources and Architectural Engineering
2015年
5期
218-222
,共5页
张军%李宏冲%李万里%刘灏懿%李森%刘威
張軍%李宏遲%李萬裏%劉灝懿%李森%劉威
장군%리굉충%리만리%류호의%리삼%류위
浆砌石坝%现场检测%参数反演%渗流%二维有限元
漿砌石壩%現場檢測%參數反縯%滲流%二維有限元
장체석패%현장검측%삼수반연%삼류%이유유한원
masonry dam%field test%parameter inversion%seepage%two-dimensional finite element
水帘水库大坝为浆砌石重力坝,水库自建成后出现两岸坝肩裂缝、坝内排水廊道底板渗水、挑流鼻坎两边挡水墙裂缝等问题,一直处于带病运行状态。为掌握大坝安全状况,根据水帘水库地质勘探和大坝安全鉴定现场检测资料,通过参数反演,对非溢流坝段和溢流坝段的典型断面进行二维渗流有限元法计算分析,全面评价了水帘水库大坝的渗流安全状况。结果表明:水帘水库上游防渗面板防渗效果下降,坝踵建基面处渗透坡降较大;在设计和校核工况下,大坝坝基扬压力较大,坝基排水孔处扬压力折减系数大于设计折减系数,大坝渗透稳定性不满足规范要求。
水簾水庫大壩為漿砌石重力壩,水庫自建成後齣現兩岸壩肩裂縫、壩內排水廊道底闆滲水、挑流鼻坎兩邊擋水牆裂縫等問題,一直處于帶病運行狀態。為掌握大壩安全狀況,根據水簾水庫地質勘探和大壩安全鑒定現場檢測資料,通過參數反縯,對非溢流壩段和溢流壩段的典型斷麵進行二維滲流有限元法計算分析,全麵評價瞭水簾水庫大壩的滲流安全狀況。結果錶明:水簾水庫上遊防滲麵闆防滲效果下降,壩踵建基麵處滲透坡降較大;在設計和校覈工況下,大壩壩基颺壓力較大,壩基排水孔處颺壓力摺減繫數大于設計摺減繫數,大壩滲透穩定性不滿足規範要求。
수렴수고대패위장체석중력패,수고자건성후출현량안패견렬봉、패내배수랑도저판삼수、도류비감량변당수장렬봉등문제,일직처우대병운행상태。위장악대패안전상황,근거수렴수고지질감탐화대패안전감정현장검측자료,통과삼수반연,대비일류패단화일류패단적전형단면진행이유삼류유한원법계산분석,전면평개료수렴수고대패적삼류안전상황。결과표명:수렴수고상유방삼면판방삼효과하강,패종건기면처삼투파강교대;재설계화교핵공황하,대패패기양압력교대,패기배수공처양압력절감계수대우설계절감계수,대패삼투은정성불만족규범요구。
Shuilian reservoir dam is classified as masonry gravity dam ,which now faces the problems of cracks on both sides of the abutment ,seepage from the floor of the discharging channel within the dam and cracks on the retaining wall beside the flip bucket after the completion of the construction .This unhealthy operation state poses a great threat to the safety of this dam .In order to understand the status of the dam safety ,according to the data of the geological survey and dam safety field tests ,two-dimensional seepage finite element analysis of the typical cross sections in the overflow and non-overflow dam sections was conducted with the parameter inversion method .Based on the analysis ,the safety status of the seepage flow in Shuilian reservoir dam was evaluated comprehensively .The evaluation results indicate that the func-tion of the anti-seepage panel in the upstream of the dam is failing with a larger seepage slope gradient at the dam heel foundation;under the design and check conditions ,the uplift pressure of the dam foundation is increased ,the value of the uplift pressure reduction coefficient of the drainage holes at the dam foundation is smaller than the design value , which leads to the conclusion that the stability of the dam seepage can not meet the requirements of the codes .