水利与建筑工程学报
水利與建築工程學報
수리여건축공정학보
Journal of Water Resources and Architectural Engineering
2015年
5期
31-35,140
,共6页
采空区%顶板厚度%安全开采跨度%颗粒流方法
採空區%頂闆厚度%安全開採跨度%顆粒流方法
채공구%정판후도%안전개채과도%과립류방법
mined-out regions%roof thickness%safe mining span%particle flow method
为了确定在不同顶板厚度下采空区的安全开采跨度,根据弹性力学知识简化采空区顶板模型,推导出了顶板挠度与荷载、厚度、跨度等参数之间的关系式,基于颗粒流方法提出了采空区在不同顶板厚度下安全开采跨度的确定方法,结合内蒙古灰窑口采空区的模拟分析,得出了该矿区顶板厚度与安全开采跨度的关系式;通过对比理论挠度值与数值监测位移,说明薄板理论分析碎裂岩体的变形误差较大,而颗粒流方法模拟碎裂岩体的破坏、大变形问题更为切合实际,可为工程顺利实施提供理论支撑,并为类似工程提供借鉴。
為瞭確定在不同頂闆厚度下採空區的安全開採跨度,根據彈性力學知識簡化採空區頂闆模型,推導齣瞭頂闆撓度與荷載、厚度、跨度等參數之間的關繫式,基于顆粒流方法提齣瞭採空區在不同頂闆厚度下安全開採跨度的確定方法,結閤內矇古灰窯口採空區的模擬分析,得齣瞭該礦區頂闆厚度與安全開採跨度的關繫式;通過對比理論撓度值與數值鑑測位移,說明薄闆理論分析碎裂巖體的變形誤差較大,而顆粒流方法模擬碎裂巖體的破壞、大變形問題更為切閤實際,可為工程順利實施提供理論支撐,併為類似工程提供藉鑒。
위료학정재불동정판후도하채공구적안전개채과도,근거탄성역학지식간화채공구정판모형,추도출료정판뇨도여하재、후도、과도등삼수지간적관계식,기우과립류방법제출료채공구재불동정판후도하안전개채과도적학정방법,결합내몽고회요구채공구적모의분석,득출료해광구정판후도여안전개채과도적관계식;통과대비이론뇨도치여수치감측위이,설명박판이론분석쇄렬암체적변형오차교대,이과립류방법모의쇄렬암체적파배、대변형문제경위절합실제,가위공정순리실시제공이론지탱,병위유사공정제공차감。
Due to the over-exploitation of the mine area ,the roofs of the mined-out regions are badly damaged ,there are even mining accidents caused by the collapse of the damaged roofs ,which greatly affect the livelihood of the people who live in the mine area and pose as a massive threat to the safe mining in the future .In order to determine the thickness of the goaf roof and the safe mining span underneath ,a series of studies were conducted .At first the formula between the deflection of the roof and the other parameters of load ,thickness and span was deduced from the roof model simplified by the elastic mechanics .And then the method of determining the safe mining span under different thickness of the goaf roof was put forward based on particle flow method .With the application of this method in the simulation analysis of Inner Mongolia Huiyaokou mined-out area ,the formula of the roof thickness and safe mining span of this area was obtained . According to the comparison of the theoretical deflection value and the monitored value of the displacement ,using thin plate theory would produce a larger error in the analysis of fractured rock mass deformation;whereas the particle flow method is more suited for the task .This study can provide some theoretical guidance for the safe mining ,as well as some reference for other similar engineering projects .