电力系统保护与控制
電力繫統保護與控製
전력계통보호여공제
Power System Protection and Control
2015年
19期
131-136
,共6页
陈涛%冯丽%吴迎霞%尚学伟%翟勇%余建明
陳濤%馮麗%吳迎霞%尚學偉%翟勇%餘建明
진도%풍려%오영하%상학위%적용%여건명
输电能力%发电调度%网架改造%直流潮流%川渝电网
輸電能力%髮電調度%網架改造%直流潮流%川渝電網
수전능력%발전조도%망가개조%직류조류%천투전망
transfer capability%generation dispatching%grid construction%DC power flow%Sichuan-Chongqing power system
重庆电网负荷的快速增长和川渝电网运行方式耦合的紧密性,导致川电东送通道在大负荷运行方式下出现功率分布严重不平衡问题,川渝电网输电能力因此受到限制.为解决该问题,基于直流潮流模型,分别从发电优化调度与互联网架建设改造两个方面建立提升川电东送输送能力的优化模型.利用优化工具分别对两种方案的优化模型进行求解,给出川渝电网发电优化调度与互联网架建设改造的优化结果.方案应用效果表明,川渝电网发电优化调度与互联网架建设改造均能提升川电东送输送能力,且川渝互联网架建设改造方案的效果更佳,工程造价相对较高.现场可根据实际条件和需求,选择合适方案进行实施.
重慶電網負荷的快速增長和川渝電網運行方式耦閤的緊密性,導緻川電東送通道在大負荷運行方式下齣現功率分佈嚴重不平衡問題,川渝電網輸電能力因此受到限製.為解決該問題,基于直流潮流模型,分彆從髮電優化調度與互聯網架建設改造兩箇方麵建立提升川電東送輸送能力的優化模型.利用優化工具分彆對兩種方案的優化模型進行求解,給齣川渝電網髮電優化調度與互聯網架建設改造的優化結果.方案應用效果錶明,川渝電網髮電優化調度與互聯網架建設改造均能提升川電東送輸送能力,且川渝互聯網架建設改造方案的效果更佳,工程造價相對較高.現場可根據實際條件和需求,選擇閤適方案進行實施.
중경전망부하적쾌속증장화천투전망운행방식우합적긴밀성,도치천전동송통도재대부하운행방식하출현공솔분포엄중불평형문제,천투전망수전능력인차수도한제.위해결해문제,기우직류조류모형,분별종발전우화조도여호련망가건설개조량개방면건립제승천전동송수송능력적우화모형.이용우화공구분별대량충방안적우화모형진행구해,급출천투전망발전우화조도여호련망가건설개조적우화결과.방안응용효과표명,천투전망발전우화조도여호련망가건설개조균능제승천전동송수송능력,차천투호련망가건설개조방안적효과경가,공정조개상대교고.현장가근거실제조건화수구,선택합괄방안진행실시.
As rapid growth of load in Chongqing and the tightness of Sichuan-Chongqing operation mode coupled, distribution of power in the transmission path from Sichuan to the east appears to be unbalanced seriously under the operation mode of heavy load. So the power transmission capacity of Sichuan-Chongqing is limited. Optimization models of optimal generation dispatching and construction of interconnected grid structure are proposed respectively to improve the capacity of power transmission from Sichuan to the east based on the DC power flow model. Optimization results of optimal generation dispatching and construction of interconnected grid structure are supplied by using optimization toolbox to solve the optimization models respectively. Application effect of the schemes shows that both optimal generation dispatching and construction of interconnected grid structure can improve power transmission from Sichuan to Chongqing. The effect of construction of interconnected grid structure is better, but its engineering cost is higher. Field technicians can choose the suitable scheme to implement based on actual conditions and requirements.