通过近几年对大厂铜坑矿的科技研究和生产实践,论述了影响生产矿量的主要问题在于地压活动频繁、井巷工程进度慢、设备老化等因素,提出了进行空区充填、加强采场设计方案可靠性论证、更新观念、引进先进设备等解决途径。
通過近幾年對大廠銅坑礦的科技研究和生產實踐,論述瞭影響生產礦量的主要問題在于地壓活動頻繁、井巷工程進度慢、設備老化等因素,提齣瞭進行空區充填、加彊採場設計方案可靠性論證、更新觀唸、引進先進設備等解決途徑。
통과근궤년대대엄동갱광적과기연구화생산실천,논술료영향생산광량적주요문제재우지압활동빈번、정항공정진도만、설비노화등인소,제출료진행공구충전、가강채장설계방안가고성론증、경신관념、인진선진설비등해결도경。
Based on technical researches conducted on Dachang copper pit mine and accumulated production practice over recent several years,the main factors that affect production output of copper pit mines lie in the frequent geostatic pressure activities,slow progress of shaft sinking and drifting,equipment aging and ect. Countermeasures including filling dead zone, enhancing the reliability of stope design scheme,innovating concepts,introducing advanced equipment are put forward.