人民黄河
人民黃河
인민황하
Yellow River
2015年
10期
7-9,14
,共4页
阎永新%姜东生%万鹏%张雨%庞进
閻永新%薑東生%萬鵬%張雨%龐進
염영신%강동생%만붕%장우%방진
吊箱缆道%渡河设施%水文装备%山东测区%水文测站%黄河
弔箱纜道%渡河設施%水文裝備%山東測區%水文測站%黃河
조상람도%도하설시%수문장비%산동측구%수문측참%황하
running scheme%siltation volume%averaged siltation thickness%sediment deposition%Shuidonggou Reservoir
电动吊箱缆道是水文测验最常用的设施装备之一,其结构简单、操作方便、使用范围广。介绍了吊箱缆道的结构组成、发展过程,对使用管理、技术设计提出了建议,结合水文监测需求展望了电动吊箱的发展趋势:①吊箱作为能安装现代水沙监测仪器的一个平台,而不是仅能使用悬杆和铅鱼等简单的测验设备;②具有吊箱水平运行的自动调整功能;③改善供电环境和方式;④设计科学、实用的安全保障措施,保证测验人员工作安全和设备安全;⑤闭口式升降吊箱。
電動弔箱纜道是水文測驗最常用的設施裝備之一,其結構簡單、操作方便、使用範圍廣。介紹瞭弔箱纜道的結構組成、髮展過程,對使用管理、技術設計提齣瞭建議,結閤水文鑑測需求展望瞭電動弔箱的髮展趨勢:①弔箱作為能安裝現代水沙鑑測儀器的一箇平檯,而不是僅能使用懸桿和鉛魚等簡單的測驗設備;②具有弔箱水平運行的自動調整功能;③改善供電環境和方式;④設計科學、實用的安全保障措施,保證測驗人員工作安全和設備安全;⑤閉口式升降弔箱。
전동조상람도시수문측험최상용적설시장비지일,기결구간단、조작방편、사용범위엄。개소료조상람도적결구조성、발전과정,대사용관리、기술설계제출료건의,결합수문감측수구전망료전동조상적발전추세:①조상작위능안장현대수사감측의기적일개평태,이불시부능사용현간화연어등간단적측험설비;②구유조상수평운행적자동조정공능;③개선공전배경화방식;④설계과학、실용적안전보장조시,보증측험인원공작안전화설비안전;⑤폐구식승강조상。
Shuidonggou Reservoir is an industrial water supply reservoir located at the junction of Ningxia and Inner Mongolia of China. Water is diverted to the reservoir through pressure pipeline from the pumping station of the Yellow River from Qingtongxia to Shizuishan. The operational time of the reservoir is divided into three stages,i. e. 2011-2014,2015-2019 and 2020-2029 based on the field measurement data from 2011,and the deposited volume and averaged thickness are calculated under four running schemes. The following conclusions can be obtained:1)The reservoir should avoid water injection during ice formation period or flood period as far as possible;2)It should adopt the intermittent and concentrated water injection scheme as far as possible;3)It is suggested to run the reservoir at lower water level from 2011 to 2014,and to run it at higher water level from 2015 to 2019 and from 2020 to 2029;3)It is suitable to inject water into the reservoir 2 or 3 times intermittently each month. It is suggested to inject extra 3 million m3 water more than actual water requirement in March,while from April to June,it is suggested to injection extra 1 million m3 water more than actual water requirement each month,the water injection amount and water requirement amount should be the same in other months.