中国核电
中國覈電
중국핵전
China Nuclear Power
2015年
3期
214-218
,共5页
汽轮机厂房标高%降低标高%方案评审
汽輪機廠房標高%降低標高%方案評審
기륜궤엄방표고%강저표고%방안평심
turbine building elevation%lowering of the elevation%the scheme review
文章介绍了方家山核电工程初步设计阶段对汽轮机房降标高设计方案的评审过程及关注要点.常规岛工程设计的好坏对于核电工程项目的影响巨大,应重视设计阶段的管理,增加设计审查的投入,特别是组织对设计方案的选择、论证、优化和评审.
文章介紹瞭方傢山覈電工程初步設計階段對汽輪機房降標高設計方案的評審過程及關註要點.常規島工程設計的好壞對于覈電工程項目的影響巨大,應重視設計階段的管理,增加設計審查的投入,特彆是組織對設計方案的選擇、論證、優化和評審.
문장개소료방가산핵전공정초보설계계단대기륜궤방강표고설계방안적평심과정급관주요점.상규도공정설계적호배대우핵전공정항목적영향거대,응중시설계계단적관리,증가설계심사적투입,특별시조직대설계방안적선택、론증、우화화평심.
This paper introduces the review process and related concerned points on the scheme of turbine building low elevation arrangement during basic design period, the quality of the conventional island engineering plays a very important role in the project engineering, the design management should be paid attention, and design review should be enhanced, especially the design scheme selection, verification and review should be organized.