中国水能及电气化
中國水能及電氣化
중국수능급전기화
China Water Power & Electrification
2015年
10期
41-43
,共3页
宿鸭湖大坝%异常渗水%分析%处理
宿鴨湖大壩%異常滲水%分析%處理
숙압호대패%이상삼수%분석%처리
Suya Lake Reservoir%abnormal water seepage%analysis%treatment
河南省宿鸭湖水库大坝渗水异常,下游出现沼泽化,长度绵延几公里,积水宽度30~50m,积水量随库水位升降而增减明显。经勘探,存在中等—强透水砂层。经方案比选,采用深层水泥土搅拌桩防渗墙进行防渗处理,施工中严格按照施工方案控制施工质量。完成后与历史同期相同水位比较,防渗效果明显。
河南省宿鴨湖水庫大壩滲水異常,下遊齣現沼澤化,長度綿延幾公裏,積水寬度30~50m,積水量隨庫水位升降而增減明顯。經勘探,存在中等—彊透水砂層。經方案比選,採用深層水泥土攪拌樁防滲牆進行防滲處理,施工中嚴格按照施工方案控製施工質量。完成後與歷史同期相同水位比較,防滲效果明顯。
하남성숙압호수고대패삼수이상,하유출현소택화,장도면연궤공리,적수관도30~50m,적수량수고수위승강이증감명현。경감탐,존재중등—강투수사층。경방안비선,채용심층수니토교반장방삼장진행방삼처리,시공중엄격안조시공방안공제시공질량。완성후여역사동기상동수위비교,방삼효과명현。
Henan Suya Lake Reservoir dam has abnormal water seepage.Paludification is occured in the downstream area, and the length extends for several kilometers.Water-logging width is 30 ~50m.Accumulated water is significantly increased or decreased with reservoir water level.Medium-strong permeable sand layer is available according to exploration. Seepage prevention treatment is implemented with deep cement-soil mixing pile cut-off wall through scheme comparison. Construction quality is controlled in strict accordance with construction plan in construction.It is compared with the same water level at the same period after the project completion,and seepage control effect is obvious.