观音岩%进度%控制%管理
觀音巖%進度%控製%管理
관음암%진도%공제%관리
Guanyinyan%progress%control%management
针对观音岩大型水电工程的特点,通过工程优化,加强资源配置、考核管理、动态控制等措施,克服了工程量大、地质条件复杂、施工组织难度大等不利因素,项目业主稳步推进工程建设,较可研阶段提前5个月发电,创造了巨大的经济效益。
針對觀音巖大型水電工程的特點,通過工程優化,加彊資源配置、攷覈管理、動態控製等措施,剋服瞭工程量大、地質條件複雜、施工組織難度大等不利因素,項目業主穩步推進工程建設,較可研階段提前5箇月髮電,創造瞭巨大的經濟效益。
침대관음암대형수전공정적특점,통과공정우화,가강자원배치、고핵관리、동태공제등조시,극복료공정량대、지질조건복잡、시공조직난도대등불리인소,항목업주은보추진공정건설,교가연계단제전5개월발전,창조료거대적경제효익。
Unbeneficial factors of large engineering quantity,complex geological conditions,high construction organization difficulty,etc.are overcome aiming at the characteristics of Guanyinyan Large Hydropower Project through optimizing engineering,strengthening resource allocation,assessment management,dynamic control and other measures.Project owner steadily promotes the project construction,and power is generated 5 months in advance compared with that in the feasibility study stage.Enormous economic benefits are achieved.