通过对朔黄铁路黄骅南站3.5亿吨扩能改造接触网施工整体方案的介绍,分析整个施工过程的阶段性特点和制约、困难因素,提出相应的解决方案,为在铁路既有线节点车站电气化改造施工提供一定的借鉴作用。
通過對朔黃鐵路黃驊南站3.5億噸擴能改造接觸網施工整體方案的介紹,分析整箇施工過程的階段性特點和製約、睏難因素,提齣相應的解決方案,為在鐵路既有線節點車站電氣化改造施工提供一定的藉鑒作用。
통과대삭황철로황화남참3.5억둔확능개조접촉망시공정체방안적개소,분석정개시공과정적계단성특점화제약、곤난인소,제출상응적해결방안,위재철로기유선절점차참전기화개조시공제공일정적차감작용。
In this paper, the overall scheme of the catenary construction of the 350 million -ton capacity expansion revamping at the Huanghua South Station of Shuohuang Railway is introduced. Characteristics and constraints in different stages and difficulties of the whole construction process are analyzed and then the corresponding solutions are put forward, which will provide certain reference for the electrification transformation construction in the existing railway stations.