西北水电
西北水電
서북수전
Northwest Water Power
2015年
5期
61-63
,共3页
马琴%冯献强%陈亮亮%段晨
馬琴%馮獻彊%陳亮亮%段晨
마금%풍헌강%진량량%단신
风电场%箱变监控系统%设计
風電場%箱變鑑控繫統%設計
풍전장%상변감공계통%설계
wind farm%monitoring system of box transformer%design
甘肃酒泉安北第三风电场 A、B 区400 MW 工程位于甘肃酒泉千万千瓦级风电基地,装机容量大、占地面积广,其箱变设置独立的监控系统有其必要性,文章对甘肃酒泉安北第三风电场 A、B 区400MW 工程箱变监控系统的功能、结构及配置等作了详细的介绍。
甘肅酒泉安北第三風電場 A、B 區400 MW 工程位于甘肅酒泉韆萬韆瓦級風電基地,裝機容量大、佔地麵積廣,其箱變設置獨立的鑑控繫統有其必要性,文章對甘肅酒泉安北第三風電場 A、B 區400MW 工程箱變鑑控繫統的功能、結構及配置等作瞭詳細的介紹。
감숙주천안북제삼풍전장 A、B 구400 MW 공정위우감숙주천천만천와급풍전기지,장궤용량대、점지면적엄,기상변설치독립적감공계통유기필요성,문장대감숙주천안북제삼풍전장 A、B 구400MW 공정상변감공계통적공능、결구급배치등작료상세적개소。
Anbei 3rd Wind Farm ( Section A and Section B) with total installed capacity of 400 MW is located in wind energy base in Ji-uquan, Gansu province.It is necessary for the box transformers to be equipped with the separate monitoring system as the higher installed ca-pacity and large land occupation of the wind farm.In the paper, functions, structure and configuration, etc of the monitoring system of the box transformers in Section A and Section B with the total installed capacity of 400 MW of Anbei 3rd Wind Farm are described in detail.