西北水电
西北水電
서북수전
Northwest Water Power
2015年
5期
42-45
,共4页
底格栏栅坝%闸坝%坝型%优化设计
底格欄柵壩%閘壩%壩型%優化設計
저격란책패%갑패%패형%우화설계
bottom trashrack dam%gate dam%dam type%optimized design
结合坝址的地质地形以及水文、泥沙情况,从水文、防渗、工程投资等方面,对底格栏栅坝和闸坝2种坝型进行了综合分析比较,结果表明,某水电站工程大坝的坝型更加适用闸坝,对以后类似工程项目的坝型选择起到一定的启发作用。
結閤壩阯的地質地形以及水文、泥沙情況,從水文、防滲、工程投資等方麵,對底格欄柵壩和閘壩2種壩型進行瞭綜閤分析比較,結果錶明,某水電站工程大壩的壩型更加適用閘壩,對以後類似工程項目的壩型選擇起到一定的啟髮作用。
결합패지적지질지형이급수문、니사정황,종수문、방삼、공정투자등방면,대저격란책패화갑패2충패형진행료종합분석비교,결과표명,모수전참공정대패적패형경가괄용갑패,대이후유사공정항목적패형선택기도일정적계발작용。
Both bottom trashrack dam and gate dam are analyzed and compared, in combination of geology, topography and hydrology at dam site, in terms of hydrology, impermeability and investment, etc.The analyzing result approves that the gate dam is the most suitable one for this hydropower project.This analysis will provide the dam type selection of the similar projects with reference in future.