西北水电
西北水電
서북수전
Northwest Water Power
2015年
5期
33-35
,共3页
双沟水电站%进水口%引水隧洞%调压井%压力管道
雙溝水電站%進水口%引水隧洞%調壓井%壓力管道
쌍구수전참%진수구%인수수동%조압정%압력관도
Shuanggou Hydropower Project%power intake%headrace tunnel%surge shaft%penstock
介绍了双沟水电站引水系统建筑物的总体布置,引水系统布置充分考虑了地形、地质和交通条件,布局合理、安全经济、运行管理方便,并采取了多项设计优化措施,减少了工程量,加快了施工进度,节约了工程投资。取得经济效益和社会效益。
介紹瞭雙溝水電站引水繫統建築物的總體佈置,引水繫統佈置充分攷慮瞭地形、地質和交通條件,佈跼閤理、安全經濟、運行管理方便,併採取瞭多項設計優化措施,減少瞭工程量,加快瞭施工進度,節約瞭工程投資。取得經濟效益和社會效益。
개소료쌍구수전참인수계통건축물적총체포치,인수계통포치충분고필료지형、지질화교통조건,포국합리、안전경제、운행관리방편,병채취료다항설계우화조시,감소료공정량,가쾌료시공진도,절약료공정투자。취득경제효익화사회효익。
The general layout of the headrace system of Shuanggou Hydropower Project is described.The layout of the headrace system, with full consideration of topography, geology and access conditions, is rationally arranged.It is safety, economic and convenient for operation management.Furthermore, a couple of design optimizing measures are taken so that work quantity is reduced, construction is expedited and investment is decreased.Both economic and social benefits are achieved.