金属矿山
金屬礦山
금속광산
Metal Mine
2015年
11期
37-41
,共5页
饶运章%张中亚%舒太镜%彭立正
饒運章%張中亞%舒太鏡%彭立正
요운장%장중아%서태경%팽립정
全尾砂%废石%复合充填体%沉降规律%模型试验
全尾砂%廢石%複閤充填體%沉降規律%模型試驗
전미사%폐석%복합충전체%침강규률%모형시험
Unclassified tailings%Waste rock%Compound filling body%Settlement law%Model test
全尾砂废石复合充填体沉降是一个复杂的非牛顿流体与固体混合物的连续介质力学加载过程,难以通过经验估算或理论推导获得其沉降规律。为研究会宝岭铁矿全尾砂-废石复合充填体沉降问题,通过相似模型试验的方法,对不同比例(高度)全尾砂、废石组成的复合充填进行室内试验模拟。结果分析表明:复合充填体中废石所占比例与其总沉降量呈递减函数关系;复合充填体总沉降量与时间的拟合关系为递减对数关系,且拟合曲线在15 d时斜率明显减小,故在15 d后复合充填体沉降量趋于稳定,可进行顶板胶结作业;比较不同废石比例的复合充填体沉降稳定所需时间,1/2废石比例的复合充填体沉降稳定最快。
全尾砂廢石複閤充填體沉降是一箇複雜的非牛頓流體與固體混閤物的連續介質力學加載過程,難以通過經驗估算或理論推導穫得其沉降規律。為研究會寶嶺鐵礦全尾砂-廢石複閤充填體沉降問題,通過相似模型試驗的方法,對不同比例(高度)全尾砂、廢石組成的複閤充填進行室內試驗模擬。結果分析錶明:複閤充填體中廢石所佔比例與其總沉降量呈遞減函數關繫;複閤充填體總沉降量與時間的擬閤關繫為遞減對數關繫,且擬閤麯線在15 d時斜率明顯減小,故在15 d後複閤充填體沉降量趨于穩定,可進行頂闆膠結作業;比較不同廢石比例的複閤充填體沉降穩定所需時間,1/2廢石比例的複閤充填體沉降穩定最快。
전미사폐석복합충전체침강시일개복잡적비우돈류체여고체혼합물적련속개질역학가재과정,난이통과경험고산혹이론추도획득기침강규률。위연구회보령철광전미사-폐석복합충전체침강문제,통과상사모형시험적방법,대불동비례(고도)전미사、폐석조성적복합충전진행실내시험모의。결과분석표명:복합충전체중폐석소점비례여기총침강량정체감함수관계;복합충전체총침강량여시간적의합관계위체감대수관계,차의합곡선재15 d시사솔명현감소,고재15 d후복합충전체침강량추우은정,가진행정판효결작업;비교불동폐석비례적복합충전체침강은정소수시간,1/2폐석비례적복합충전체침강은정최쾌。
The settlement of unclassified tailings waste rock compound filling body is a complex continuum mechanics loading process of non-Newtonian fluid and solid mixture,so it is difficult to obtain the settlement laws through the theoretical derivation or experience. In order to investigate the settlement of unclassified tailings waste rock compound filling body in Huibaoling Iron Mine,the similarity model test method is adopted to make the indoor simulation experiment on composite filling body with different proportions ( height) of unclassified tailings and waste rock. The results showed that the proportion of waste rocks in compound filling body has a decreasing function with the total settlement amount. The fitting of total settlement amount of the compound filling body with time shows a decreasing logarithmic relationship among them. And the fitting curve signifi-cantly declined at 15d,so the settlement of compound filling approached to be stable after 15d,and roof cementation can be op-erated. After contrast on the time that required by settlement of compound filling with different proportions of waste rock,com-pound filling body with 1/2 ratio of waste rock has the fastest settlement.