中国港湾建设
中國港灣建設
중국항만건설
China Harbour Engineering
2015年
11期
56-58
,共3页
平面拟合模型%构件安装%精密测量
平麵擬閤模型%構件安裝%精密測量
평면의합모형%구건안장%정밀측량
plane fitting model%component installation%precision measurement
以港珠澳大桥岛隧工程预制沉管管节接头构件端钢壳的安装为案例,介绍最为关键的安装测量技术,并重点阐述了平面拟合模型的应用。对模型在软件开发和运用中的重要特征进行总结,有助于从理论上认识大型构件安装的核心问题。
以港珠澳大橋島隧工程預製沉管管節接頭構件耑鋼殼的安裝為案例,介紹最為關鍵的安裝測量技術,併重點闡述瞭平麵擬閤模型的應用。對模型在軟件開髮和運用中的重要特徵進行總結,有助于從理論上認識大型構件安裝的覈心問題。
이항주오대교도수공정예제침관관절접두구건단강각적안장위안례,개소최위관건적안장측량기술,병중점천술료평면의합모형적응용。대모형재연건개발화운용중적중요특정진행총결,유조우종이론상인식대형구건안장적핵심문제。
Taking the end steel shell installation of pipe-joint member in prefabricated immersed tube of the Hongkong-Zhuhai-Macao Bridge island & tunnel project as an example, we described the most critical installation measurement technology, focused on the application of plane fitting model, summarized an important feature of the model in software development and application, which can help to understand the core issues of large component installation from the theoretical level.