冶金动力
冶金動力
야금동력
Metallurgical Power
2015年
12期
24-26
,共3页
干熄焦%技术%设备%总结
榦熄焦%技術%設備%總結
간식초%기술%설비%총결
CDQ%technology%equipment%conclude
通过某焦化企业干熄焦项目的实施,从设计及设备的角度对过程中遇到的问题进行了分析和总结,并对部分问题提出了解决方案.
通過某焦化企業榦熄焦項目的實施,從設計及設備的角度對過程中遇到的問題進行瞭分析和總結,併對部分問題提齣瞭解決方案.
통과모초화기업간식초항목적실시,종설계급설비적각도대과정중우도적문제진행료분석화총결,병대부분문제제출료해결방안.
A coking plant implemented a coke dry quenching (CDQ) project. Problems during the implementation process of the project were analyzed and concluded from the angles of designing and equipment and solutions to some of the problems were also provided.