桥塔%主梁%斜拉索%施工监控
橋塔%主樑%斜拉索%施工鑑控
교탑%주량%사랍색%시공감공
bridge tower%major tower%stay cable%construction monitoring
以如皋长江大桥的总体设计为例,介绍了该桥桥塔、主梁、斜拉索等设计要点,并从主墩承台基础、主塔、主梁、施工监控等方面入手,对桥梁施工过程中的操作要点进行了总结,指出该桥建成后各项指标均满足设计与规范要求。
以如皋長江大橋的總體設計為例,介紹瞭該橋橋塔、主樑、斜拉索等設計要點,併從主墩承檯基礎、主塔、主樑、施工鑑控等方麵入手,對橋樑施工過程中的操作要點進行瞭總結,指齣該橋建成後各項指標均滿足設計與規範要求。
이여고장강대교적총체설계위례,개소료해교교탑、주량、사랍색등설계요점,병종주돈승태기출、주탑、주량、시공감공등방면입수,대교량시공과정중적조작요점진행료총결,지출해교건성후각항지표균만족설계여규범요구。
Taking integral Yangze river bridge design in Rugao as an example,the paper introduces design points of the bridge tower,major beam and inclined cable and other parts. Starting from aspects of major tower cushion cap foundation,major tower,major beam and construction moni-toring,it summarizes operation points in bridge construction process,and points out that:all indicators of bridge built meet design and norms de-mands.