可控源音频大地电磁测深%卡尼亚电阻率%采空区%建筑场地
可控源音頻大地電磁測深%卡尼亞電阻率%採空區%建築場地
가공원음빈대지전자측심%잡니아전조솔%채공구%건축장지
controlled-source audiomagnetotelluric sounding%Cagniard resistivity%worked-out area%construction site
焦作市某煤矿拟建安置小区范围内有十余个村办小煤窑,先后开采过二1煤层和一5煤层,采深80~160 m,总采厚7.3 m左右。为准确分析评价采空区的稳定性,采用可控源音频大地电磁测深进行采空区探测。测区内完成测线8条,测点数75个,测线总长度3.75km。测量参数:发射偶极距AB为2 km,点距MN为25 m,收发距Rx为4.5~5.5 km,采集频率范围为7680~1 Hz。根据各测线反演得到的电阻率断面图进行解释,共圈出采空区4处、推断断层4条。经钻孔验证解释完全正确,推断出的上覆岩层冒落、断裂破坏及离层发育程度基本一致;与部分采掘工程平面图确认的的采空区边界基本吻合。
焦作市某煤礦擬建安置小區範圍內有十餘箇村辦小煤窯,先後開採過二1煤層和一5煤層,採深80~160 m,總採厚7.3 m左右。為準確分析評價採空區的穩定性,採用可控源音頻大地電磁測深進行採空區探測。測區內完成測線8條,測點數75箇,測線總長度3.75km。測量參數:髮射偶極距AB為2 km,點距MN為25 m,收髮距Rx為4.5~5.5 km,採集頻率範圍為7680~1 Hz。根據各測線反縯得到的電阻率斷麵圖進行解釋,共圈齣採空區4處、推斷斷層4條。經鑽孔驗證解釋完全正確,推斷齣的上覆巖層冒落、斷裂破壞及離層髮育程度基本一緻;與部分採掘工程平麵圖確認的的採空區邊界基本吻閤。
초작시모매광의건안치소구범위내유십여개촌판소매요,선후개채과이1매층화일5매층,채심80~160 m,총채후7.3 m좌우。위준학분석평개채공구적은정성,채용가공원음빈대지전자측심진행채공구탐측。측구내완성측선8조,측점수75개,측선총장도3.75km。측량삼수:발사우겁거AB위2 km,점거MN위25 m,수발거Rx위4.5~5.5 km,채집빈솔범위위7680~1 Hz。근거각측선반연득도적전조솔단면도진행해석,공권출채공구4처、추단단층4조。경찬공험증해석완전정학,추단출적상복암층모락、단렬파배급리층발육정도기본일치;여부분채굴공정평면도학인적적채공구변계기본문합。
There were 10 more village run small coalmines in an allocation residential area proposed by a coalmine in the Jiaozuo City, the place once mined coal seams II1 and I5 successively with mining depth 80~160 m, total mining thickness about 7.3m. To correctly analyze and assess worked-out area stability, using controlled-source audiomagnetotelluric sounding carried out worked-out area pros?pecting. In the area has 8 prospecting lines, 75 survey stations, total prospecting line length 3.75km. Surveying parameters:emission di?pole moment AB is 2km, distance between electrode MN 25m, space between receiver and transmitter Rx 4.5~5.5km, acquisition fre?quency range 7 680~1 Hz. According to each line inversion obtained resistivity profiles carried out interpretation, totally have delineat?ed 4 worked-out areas, deduced 4 faults. After drilling verification confirmed the interpretation all right, deduced overburden strata caving, fracture failure and bed separation development degree essentially in agreement, basically coincided with some mining engi?neering plan confirmed worked-out area boundaries.