箱梁预制%大临工程%施工技术
箱樑預製%大臨工程%施工技術
상량예제%대림공정%시공기술
box beam prefabrication%large-scale temporary project%construction technology
结合京福客专某制梁场箱梁预制工程实例,对大临工程设计到预制方法及工艺的实施过程进行了综合论述,为今后快速而经济地建设类似条件箱梁预制场提供了参考。
結閤京福客專某製樑場箱樑預製工程實例,對大臨工程設計到預製方法及工藝的實施過程進行瞭綜閤論述,為今後快速而經濟地建設類似條件箱樑預製場提供瞭參攷。
결합경복객전모제량장상량예제공정실례,대대림공정설계도예제방법급공예적실시과정진행료종합논술,위금후쾌속이경제지건설유사조건상량예제장제공료삼고。
Combining with engineering example of a box beam prefabrication yard for Jing-Fu passenger dedicated railway, it is discussed comprehensively that large-scale temporary project design to the precast method and process of the implementation of the process, which provides references for the rapid and economical construction of similar conditions in future.