电厂在宁夏宁东的马家滩,属于黄河流域黄土高原干旱草原区,气候干燥,年降水量少而集中,蒸发强烈;道路设计是300厚C30混凝土,分作二次施工,每层厚150mm。控制好混凝土的施工措施,保证道路的整体性。
電廠在寧夏寧東的馬傢灘,屬于黃河流域黃土高原榦旱草原區,氣候榦燥,年降水量少而集中,蒸髮彊烈;道路設計是300厚C30混凝土,分作二次施工,每層厚150mm。控製好混凝土的施工措施,保證道路的整體性。
전엄재저하저동적마가탄,속우황하류역황토고원간한초원구,기후간조,년강수량소이집중,증발강렬;도로설계시300후C30혼응토,분작이차시공,매층후150mm。공제호혼응토적시공조시,보증도로적정체성。
The power plant is located in Majiatan, Ningdong of Ningxia, which belongs to the Yellow River basin of the loess plateau dry grassland region where the climate is dry, the annual precipitation is little and concentrated, and the evaporation is strong. The road design is 300 thick C30 concrete, and is divided into two construction stages, each layer 150mm. Good control of concrete construction measures are needed to ensure the integrity of the road.