路桥工程%工程量清单计价%造价管理
路橋工程%工程量清單計價%造價管理
로교공정%공정량청단계개%조개관리
road and bridge project%engineering quantity list pricing%cost management
路桥工程工期较长,传统的定额计价模式在路桥工程整个周期中不能体现市场因素的浮动性,而工程量清单计价模式克服了这种缺点,在路桥造价管理中得到广泛应用,下面重点介绍工程量清单计价的特点和在路桥工程造价管理中的应用。
路橋工程工期較長,傳統的定額計價模式在路橋工程整箇週期中不能體現市場因素的浮動性,而工程量清單計價模式剋服瞭這種缺點,在路橋造價管理中得到廣汎應用,下麵重點介紹工程量清單計價的特點和在路橋工程造價管理中的應用。
로교공정공기교장,전통적정액계개모식재로교공정정개주기중불능체현시장인소적부동성,이공정량청단계개모식극복료저충결점,재로교조개관리중득도엄범응용,하면중점개소공정량청단계개적특점화재로교공정조개관리중적응용。
The duration of road and bridge project is longer, floating traditional quota valuation mode does not reflect the market factors in the cycle of road and bridge project, but the engineering quantity list valuation model overcame this shortc-oming, obtained the widespread application in the cost manag-ement of road and bridge project, the fol owing introduces cha-racteristics of engineering quantity list valuation and the appli-cation in the engineering cost management of road and bridge project.