城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2013年
10期
30-30
,共1页
客站%工期%优化
客站%工期%優化
객참%공기%우화
station%schedule%optimization
以用科学换时间,用空间换时间的工作思路,认真贯彻“六位一体”,坚持“四化”建设,合理优化铁路客站建设工期。确保客运专线在开通之时,现代化的铁路客站能够同时运营。服务出行旅客,让人民群众满意。
以用科學換時間,用空間換時間的工作思路,認真貫徹“六位一體”,堅持“四化”建設,閤理優化鐵路客站建設工期。確保客運專線在開通之時,現代化的鐵路客站能夠同時運營。服務齣行旅客,讓人民群衆滿意。
이용과학환시간,용공간환시간적공작사로,인진관철“육위일체”,견지“사화”건설,합리우화철로객참건설공기。학보객운전선재개통지시,현대화적철로객참능구동시운영。복무출행여객,양인민군음만의。
Taking the work train of using science for time, work space for time, seriously implement the “Six in One”, ad-hered to the “Four Modernizations” construction, reasonably optimize the construction period of railway passenger station. Ensure that the passenger dedicated line at the time of openin-g, and the modern railway station can be run at the same time. Provide service to travel passenger, satisfy the masses.