城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2013年
14期
100-100,101
,共2页
后浇带%质量处置%施工要求
後澆帶%質量處置%施工要求
후요대%질량처치%시공요구
post-pouring belt%quality management%construct-ion requirements
当建筑物结构设计根据具体情况不设置永久变形缝时,施工后浇带是解决施工阶段的差异沉降的重要方式,由于施工周期长,应重视其施工质量问题和处置方式。
噹建築物結構設計根據具體情況不設置永久變形縫時,施工後澆帶是解決施工階段的差異沉降的重要方式,由于施工週期長,應重視其施工質量問題和處置方式。
당건축물결구설계근거구체정황불설치영구변형봉시,시공후요대시해결시공계단적차이침강적중요방식,유우시공주기장,응중시기시공질량문제화처치방식。
When the building structure design according to the specific situation of not set ing the permanent deformation joi-nts, construction post-pouring belt is an important way to solve differential settlement in the construction stage, because of lo-ng construction period, we should pay more at ention to its co-nstruction quality problems and treatment.