山区公路沿河、傍山展线时,隧洞洞口受山体的影响,山体斜交,洞口段不可避免地存在偏压和浅埋,从而导致进洞困难。半明半暗进洞法对斜交偏压具有较好的适应性,本文介绍了半明半暗进洞的施工顺序和支护方法,可为类似工程参考。
山區公路沿河、傍山展線時,隧洞洞口受山體的影響,山體斜交,洞口段不可避免地存在偏壓和淺埋,從而導緻進洞睏難。半明半暗進洞法對斜交偏壓具有較好的適應性,本文介紹瞭半明半暗進洞的施工順序和支護方法,可為類似工程參攷。
산구공로연하、방산전선시,수동동구수산체적영향,산체사교,동구단불가피면지존재편압화천매,종이도치진동곤난。반명반암진동법대사교편압구유교호적괄응성,본문개소료반명반암진동적시공순서화지호방법,가위유사공정삼고。
When the mountain highway is along the river and mountain, the tunnel hole is affected by the mountain and mountain oblique. The portal section inevitably exist bias and shal ow buried, which lead to the dif icult into the hole. Half bright and half dark holed method has good adaptability to the oblique bias. This article introduces the construction sequence and the supporting method of half bright and half dark hole, in order to provide reference for similar projects.