城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2014年
15期
255-255
,共1页
坡地建筑%旋挖灌注%端承桩基%隔离措施%技术借鉴
坡地建築%鏇挖灌註%耑承樁基%隔離措施%技術藉鑒
파지건축%선알관주%단승장기%격리조시%기술차감
hil-side-building%rotary-bored-pile%end-currying-piles%isolation-measure%technical-reference
本文主要介绍了一种坡地建筑旋挖灌注端承桩基成孔隔离措施,并通过在贵阳中天未来方舟 G1组团三标段的应用,总结了一种坡地建筑旋挖灌注端承桩基成孔隔离方法及结构,希望为以后类似的成孔方式提供技术借鉴。
本文主要介紹瞭一種坡地建築鏇挖灌註耑承樁基成孔隔離措施,併通過在貴暘中天未來方舟 G1組糰三標段的應用,總結瞭一種坡地建築鏇挖灌註耑承樁基成孔隔離方法及結構,希望為以後類似的成孔方式提供技術藉鑒。
본문주요개소료일충파지건축선알관주단승장기성공격리조시,병통과재귀양중천미래방주 G1조단삼표단적응용,총결료일충파지건축선알관주단승장기성공격리방법급결구,희망위이후유사적성공방식제공기술차감。
This article mainly introduces an isolation measure of hole forming technology of rotary bored pile end currying piles in hil side building, and through the application in Zhon-gtian Future Ark G1 group 3-contract section, summarizes a method and structure of hole forming technology of rotary bored pile in hillside building, and hope for provide techni-cal reference for similar hole forming ways.