城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2014年
12期
345-345
,共1页
高速公路%上跨铁路%建设程序
高速公路%上跨鐵路%建設程序
고속공로%상과철로%건설정서
highway%the cross railway%construction program
随着路网密度的进一步提升,使得公路跨越铁路的次数不断增加,给各参建单位的项目管理带来了诸多困难。本文以黄祁高速公路上跨皖赣铁路为实例,介绍了高速公路上跨铁路的建设程序,供建设、施工、监理单位参考。
隨著路網密度的進一步提升,使得公路跨越鐵路的次數不斷增加,給各參建單位的項目管理帶來瞭諸多睏難。本文以黃祁高速公路上跨皖贛鐵路為實例,介紹瞭高速公路上跨鐵路的建設程序,供建設、施工、鑑理單位參攷。
수착로망밀도적진일보제승,사득공로과월철로적차수불단증가,급각삼건단위적항목관리대래료제다곤난。본문이황기고속공로상과환공철로위실례,개소료고속공로상과철로적건설정서,공건설、시공、감리단위삼고。
With the further improvement of road network de-nsity, which make the road across the railway times growing and bring many dificulties to the project management of the contractors. This article takes the Huang Qi highway cross the WanGan railway as an example, introduces the construction procedure of highway across the railway to provide reference for the building, construction and supervision units.