深基坑%工程实例%施工方案
深基坑%工程實例%施工方案
심기갱%공정실례%시공방안
deep foundation pit%engineering example%const-ruction plan
深基坑基础施工周期较长,考虑降低施工成本的同时,必须充分考虑此期间的基坑降水、排水及土体边坡稳定性,施工安全不可忽视。现结合我公司施工实例对深基坑施工问题作简单讨论。
深基坑基礎施工週期較長,攷慮降低施工成本的同時,必鬚充分攷慮此期間的基坑降水、排水及土體邊坡穩定性,施工安全不可忽視。現結閤我公司施工實例對深基坑施工問題作簡單討論。
심기갱기출시공주기교장,고필강저시공성본적동시,필수충분고필차기간적기갱강수、배수급토체변파은정성,시공안전불가홀시。현결합아공사시공실례대심기갱시공문제작간단토론。
The deep foundation pit construction period is long enough, consider the reduction of construction cost at the same time, people must give ful consideration to the foundation pit precipitation, drainage and soil slope stability in this period, and construction safety cannot be ignored. This article com-bines with the company construction instance to simple discuss the problem of deep foundation pit construction.